Industrial equipment assembly
Our teams handle, position, assemble and integrate equipment and technical assemblies in their final location. Each operation is planned around the site constraints, access conditions, technical interfaces and the overall organisation of the project.
Erection of structures, walkways and platforms
ROMA2S installs steel structures, walkways, platforms and supports for industrial facilities. In 2024, our teams assembled a complex platform at the Airbus site in Rochefort on behalf of LAROCHE, a reference in the
aerospace sector. In the nuclear sector, they are involved, working for INEO Nucléaire, in assembling electrical supports at the CEA site in Valduc.
Equipment replacement on existing installations
On an existing installation, assembly work may first require old structures to be dismantled. At the Saint-Gobain site in Thourotte, on behalf of MAGNIER INDUSTRIES, fifteen ROMA2S employees dismantled old structures and then integrated new hoppers, working at height and handling heavy loads: read about the
Thourotte project. This reference illustrates our work in the
industrial sector.
Mechanical maintenance work, particularly during production shutdowns, is presented on our
Industrial Maintenance page.
From our Pitești workshop to your site
Equipment and structures fabricated in our Pitești workshop can be transported to site and then installed by our teams: the Thourotte hoppers, for example, were fabricated in Romania before being integrated on site. For supports, frames and welded assemblies fabricated to drawing, see our
Industrial boilermaking page.
Preparing your industrial assembly project
To assess your project, please send us the information available:
- The type, dimensions and weight of the equipment or structures to be installed.
- Available drawings and technical documents.
- Location and working conditions: access, work at height, coordination with other contractors.
- Required timescales.